The service/timer scripts are tested, installed and running.
What's left:
1. Limit switch
2. Solar sensor installation.
3. Possible installation of a replacement relay for the actuator power supply.
A lot has been done since the last post. Previously, I had 580 watts of solar panel power. One of the panels, on examination, had lost a s...
No comments:
Post a Comment