The service/timer scripts are tested, installed and running.
What's left:
1. Limit switch
2. Solar sensor installation.
3. Possible installation of a replacement relay for the actuator power supply.
The battery bank has been wired in parallel with system connections at the closest battery. This creates an unbalanced load on the bank. ...
No comments:
Post a Comment