Tuesday, June 22, 2021

RPi Running 24/7

 The service/timer scripts are tested, installed and running.

What's left:

1. Limit switch

2. Solar sensor installation.

3. Possible installation of a replacement relay for the actuator power supply.

No comments:

Post a Comment

Battery bank wiring modification

  The battery bank has been wired in parallel with system connections at the closest battery. This creates an unbalanced load on the bank.  ...